Constructex is produced by rotary swaging a completed rope after manufacture. This swaging process reduces the rope diameter and reforms the profile of the outer strands, providing a rope that performs excellent in multilayer drum applications.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.