The Tiger 18M PI stage sinking rope with a two Layer construction over a WSC. This rotation resistant rope can be impregnated with plastic for a better corrosion resistance.
Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.