Kiev Olympic Stadium



The Olympic Stadium in Kiev is one of the eight venues for the EURO 2012 football tournament being staged jointly in Poland and Ukraine.

We supplied the steel cables and connecting elements for the spoke wheel roof structure for the upgrading of the original stadium. The stadium is now completely modernized and ensures unrestricted views of the whole playing surface from any position around the seating bowl.

The Locked Coil, Spiral Strands and Stainless Steel cables were manufactured at our Doncaster, Willington Quay and Gelsenkirchen sites over a period of 18 month, from April 2010 to October 2011. There were over 4,000 components manufactured for the roof structure, with a total weight of 760 tonnes.

The difficult technical requirements and a tight planning and production period made this project particularly challenging and stretched our teams to the full. A number of teams across the Group collaborated and worked incredibly hard to ensure we ultimately met the exacting requirements of our customer, including the quality assessment of our product on the construction site by a number of consultants and architects.

The stadium’s first event, a football match between Germany and Ukraine, took place on 11 November. The match ended in a three-all draw, and for Bridon brought us a step closer to achieving our vision to become Global Technology Leaders for demanding rope applications.


  • Location
    Kiev, Ukraine
  • Realised for
    Zavod Master Profi
  • Owner
    Ministry of Family, Youth and Sports of Ukraine
  • Products/ Services supplied
    Galfan coated locked coil and spiral strand assemblies                

Did you know?

  • Doha International Airport
    Doha, Qatar

    The New Doha International Airport expansion will be a major hub for Qatar Airways in the Middle East.
    Elementos de Izaje
  • Kiev Olympic Stadium
    Kiev, Ukraine

    The Olympic Stadium in Kiev is one of the eight venues for the EURO 2012 football tournament being staged jointly in Poland and Ukraine.
    Read more
  • Newport city Footbridge
    Newport, Wales

    Bridon-Bekaert manufactured the cable assemblies and provided installation and tensioning equipment and assistance for the Newport City Bridge in Wales, UK.
    Read more
  • Forth Road Bridge

    Bridon-Bekaert Ropes Group repairs one of Europe's largest suspension bridges, providing maximum cost savings.
    Forth Road Bridge
  • Nebelhornbahn

     The Nebelhornbahn, located in Oberstdorf (Allgäu), connects the valley station (812m), the middle station and the mountain peak station with the 2224m high Nebelhorn. The Nebelhornbahn AG was founded in 1927 and went operational in 1930. 
    Nebelhornbahn cableway